Pwd Dsr 2017-18 Maharashtra !!hot!! Jun 2026

This DSR was valid from April 1, 2017, to March 31, 2018 (FY 2017-18). It has since been superseded by DSR 2018-19, 2019-20, and later editions.

All items must follow the PWD standard specifications; for electrical works, the "Specifications for Electrical Works 2008" (amended) apply. Basic Material Rates (Sample) pwd dsr 2017-18 maharashtra

(Note: These rates exclude GST, which was introduced from July 1, 2017; DSR 2017-18 was pre-GST, so works contracts used VAT + Service Tax composition until transition norms.) This DSR was valid from April 1, 2017,